Movers arrive in 3.5 days to pack and take away my things. In the meantime, I am charged with painting my kitchen back to a white-ish color (i.e. covering up Home Depot Orange), purging, and packing the stuff I'm going to need for the 12th-21st. I realize the orange wall is going to be a multi-coat process. Right now I'm waiting for the second half of the yellow wall(s) to dry so I can put on coat Numero Dos.